Basic Info.
Model NO.
HXDL
Bearing Capacity
42-186kg
Thickness
2-5mm
Transport Package
Ply Wood Case
Specification
30# 40# 50#
Trademark
Tianbao
Origin
Chongqing
HS Code
84314999
Production Capacity
10000 Meters Per Month
Product Description
The HXDL components: cable track (cable rail), trolley, flat cable, hanging bracket, coupling, top and end device.
The festoon system is widely applied to the mobile device power transmission system in the filed of Tobacco machinery,
railway good yard and the port, etc.
Technique parameter:
1 Material: cold-rolling galvanized steel or stainless steel
2 Ambient temperature: -35ºC-90ºC
3 Trolley movement speed: V<120m/min
4 Trolley service life: 32000H
Picture
Components:
1. C rail
The trolley moving in the C rail
Include straight track abd curved section with R more than 500mm.
The length for the straight section is 4m.
It is extended with the coupling.
Model No. | A | B | C | D |
HXDL-30 | 33 | 40 | 14 | 2 |
HXDL-40 | 40 | 40 | 14 | 2.5 |
HXDL-50 | 50 | 50 | 16 | 2.5 |
HXDL-60 | 63 | 63 | 18 | 4.5 |
HXDL-70 | 72 | 68 | 22 | 4.5 |
HXDL-100 | 100 | 100 | 35 | 5 |
2. Cable trolley
Towing trolley
The towing trolley, it drives the middle trolley move along the track.
Four fully enclosed ball bearings, flexible,applied to the dense dust occasion.
Model No. | A | L | H | R |
HXDL-301 | 116 | 130 | 20 | 27 |
HXDL-401 | 116 | 130 | 20 | 27 |
HXDL-501 | 200 | 188 | 25 | 37 |
HXDL-601 | 200 | 188 | 30 | 37 |
HXDL-701 | 165 | 190 | 30 | 50 |
HXDL-1001 | 310 | 206 | 60 | 100 |
Middle trolley
Wheel: fully enclosed ball bearing
Cable clamp: curved soft rubber cushion
The bumper is installed in case of impact.
Model No. | A | L | H | R |
HXDL-302 | 55 | 106 | 25 | 27 |
HXDL-402 | 55 | 106 | 25 | 27 |
HXDL-502 | 84 | 128 | 25 | 37 |
HXDL-602 | 94 | 158 | 30 | 37 |
HXDL-702 | 160 | 190 | 30 | 50 |
HXDL-1002 | 260 | 206 | 60 | 100 |
3.Coupling
Cold-rolled steel sheet.
Bolting locking.
Extending the track.
Model No. | A | B | C |
HXDL-303 | 38 | 48 | 20 |
HXDL-403 | 50 | 50 | 20 |
HXDL-503 | 60 | 60 | 22 |
HXDL-603 | 73 | 73 | 20 |
HXDL-703 | 88 | 88 | 27 |
HXDL-1003 | 114 | 114 | 45 |
4. Hanger bracket
Bolt locking.
Model No. | A | B | C | L |
HXDL-304 | 38 | 48 | 20 | 80 |
HXDL-404 | 50 | 50 | 20 | 80 |
HXDL-504 | 60 | 60 | 22 | 85 |
HXDL-604 | 73 | 73 | 20 | 130 |
HXDL-704 | 88 | 88 | 27 | 140 |
HXDL-1004 | 114 | 114 | 45 | 170 |
5. Top and end device
Top device
Be installed at the top of the track to fix the cable.
Cable is connected to the power supply box and cable trolley.
Model No. | L | H | R |
HXDL-305 | 90 | 25 | 27 |
HXDL-405 | 90 | 25 | 27 |
HXDL-505 | 90 | 25 | 37 |
HXDL-605 | 100 | 30 | 37 |
HXDL-705 | 120 | 30 | 50 |
HXDL-1005 | 230 | 60 | 100 |
Prevent the trolley slide out of the track.
Model No. | L | B | C |
HXDL-30 | 90 | 40 | 20 |
HXDL-40 | 90 | 40 | 20 |
HXDL-50 | 100 | 40 | 30 |
HXDL-60 | 100 | 50 | 30 |
HXDL-70 | 120 | 50 | 60 |
HXDL-100 | 230 | 85 | 80 |
6.Tow arm
Fix the top trolley and the middle device.
Application
Configuration of cable trolley and accessories:
Hanger: every 2 meter
Middle cable trolley: every 2 meters
Coupling: same with the track numbers
Top trolley: every line one set
Two arm: one piece each line
Top and end device: one set each line
Steel rop: L=1.2xtrack length +length of trolley stored + length to power source.
Order notice:
1. Track length:____meter
2. Cable length:____meter
3. Quantity of trolley:____pcs (2m ~ 4m with a trolley)
4. Quantity of coupling joints:___pcs (A joint is required when the guide rail is longer than 4m or 6m)
5. Others parts will be list in our quotation.
Company profile